Throughout production, there are processes that require verification, ranging from PCB level through ICT-, flash-, functional- until final test.
IPTE test systems are adapted specifically to each of theses areas to perform a maximum of capabilities with an emphasis on flexibility and re-use.
Changing requirements drive us to innovate and build up our expertise on an on-going base.